PolyMed

What we've delivered

The fastest way to judge a supplier is to look at what they’ve already installed. Here are projects we’ve completed
in Oman, with the client’s permission.

Our Projects

Case Study

Client: A private polyclinic in Muscat
Sector: Clinic
Scope: Patient Monitoring and Diagnostic Equipments
Timeline: 6 Weeks

The Requirement

The clinic was opening additional departments and needed reliable monitoring and diagnostic equipment to ensure patient safety and quality care.

What we did

We supplied patient monitors, ECG, spirometry and vital signs devices, installed and integrated them, and trained clinical and biomedical staff.

The result

The clinic was opening additional departments and needed reliable monitoring and diagnostic equipment to ensure patient safety and quality care.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
John Doe
Clinic Director
Client: A private laboratory in Muscat
Sector: Laboratory
Scope: Laboratory analyzers and accessories
Timeline: 8 weeks

The Requirement

The client needed to expand testing capacity across biochemistry, hematology, and immunology to meet growing demand while reducing sample turnaround time.

What we did

We supplied and installed automated laboratory analyzers from leading manufacturers, designed the workflow, integrated the equipment.

The result

Turnaround time was reduced by 40%, and daily testing capacity increased from 250 to 450 samples, improving operational efficiency and patient service.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
John Doe
Laboratory Manager
Client: A private hospital in Muscat
Sector: Hospital
Scope: Imaging equipment and installation
Timeline: 12 weeks

The Requirement

The hospital planned to upgrade its imaging department with advanced diagnostic equipment to improve clinical accuracy, increase patient throughput, and support.

What we did

We supplied and installed a complete imaging solution, including a 1.5T MRI system and digital X-ray equipment. Our team managed preparation and installation

The result

MRI scanning capacity increased by 60% within the first three months, while diagnostic report turnaround time improved by 30%.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
John Doe
Head of Radiology
Client: A leading corporate organisation in Muscat
Sector: Corporate
Scope: Health screening and wellness solutions
Timeline: 4 weeks

The Requirement

The organisation wanted to improve employee well-being by introducing a workplace health screening programme. They needed a reliable solution to conduct routine health checks with minimal disruption to daily operations.

What we did

PolyMed supplied and installed a complete employee wellness screening solution, including health monitoring devices, vital signs equipment, and reporting tools. Our team handled installation and other things.

The result

The programme helped identify potential health risks at an early stage, increased employee participation in wellness initiatives, and reduced the time required.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
John Doe
HR & Corporate Wellness Manager
Client: A government healthcare authority in Oman
Sector: Government
Scope: Medical equipment supply and installation
Timeline: 10 weeks

The Requirement

The authority required a trusted supplier to deliver and install medical equipment for multiple healthcare facilities as part of a public healthcare improvement initiative. The project demanded timely delivery, regulatory and compliance.

What we did

PolyMed managed the complete project, including Ministry of Health registration support, equipment supply, installation, testing, commissioning, and end-user training.

The result

The equipment met all required technical and regulatory standards, while local engineering support ensured minimal downtime and efficient maintenance.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
John Doe
Project Manager, Government Healthcare Authority
Scroll to Top